Service details
We lay cables in underground ducts or on poles depending on the route
They are brought to cabinets and distribution points
Spare cable is left wherever future maintenance will need it
Inside the ducts the cable is pulled or blown in as the route allows
We watch the pulling tension and bend radius so the fibers come to no harm
Every cable is numbered and labeled along the whole route
At the end the client receives labeled cables ready for splicing
A record of every route comes with them showing its length and where the spare cable lies






