Service details
The service starts with a survey of the route on site
We then dig the trenches and lay protective ducts with manholes along the route
Backfilling and resurfacing close the job
We work in roads and on open ground and adapt to each site
Before digging we locate the utilities already underground so we do not damage them
Trenches are dug to the required depth and width
Warning tape goes over the ducts before backfilling
Our safety procedures protect our crews and passers-by and keep traffic moving
At the end the client receives a route ready for cable laying
It comes with a drawing of what was built on the ground
And the site is restored to its original state