Article27 November 2026
What Is FTTH and How Is a Fiber-to-the-Home Network Built?
A plain guide to FTTH: how optical fiber reaches the home, what the network is made of from the central office to the subscriber, and the stages of building one.

Telecom news from Syria and articles on fiber networks and data centers
Article27 November 2026
A plain guide to FTTH: how optical fiber reaches the home, what the network is made of from the central office to the subscriber, and the stages of building one.
Article27 November 2026
A step-by-step look at building a fiber-optic route: survey, permits and civil works, ducts and manholes, cable pulling or blowing, splicing, testing, documentation and handover.
Article27 November 2026
A plain explanation of fiber link testing: what an OTDR and a power meter measure, how to read the results, and what a good handover file should contain.
Article27 November 2026
A practical guide to data center and server room fit-out: racks, structured cabling, pathways, labelling, separating power from data, and what to settle before work starts.
Article27 November 2026
Submarine cables carry most intercontinental internet traffic, but faults are routine. We explain the role of terrestrial fiber, why resilient countries combine both, and what that means for Syria.
Article27 November 2026
A national fiber backbone is the spine of a country's internet. We explain what SilkLink and Barq Net change for capacity, open wholesale access, FTTH and data centers in Syria.
Article27 November 2026
Much of the data moving between Europe and Asia passes through the Red Sea, a single point of failure. We explain how an overland corridor through Syria, via SilkLink, could add an alternative route.
11 November 2026
Syria's communications minister and ITU Secretary-General Doreen Bogdan-Martin discussed SilkLink as an additional Europe-Asia data route through Syria that would reduce traffic concentration.
News25 October 2026
Syrian Telecom's Deir ez-Zor branch has begun the governorate's first Barq Net fiber network core, in the Fillat al-Baladiya neighbourhood, aiming to cover about 80% of it within a month and replace old copper.

Next step
Tell us where the project is and what it involves so our team can come back with a clear plan in stages