Syria's Ministry of Communications and Information Technology has put draft version 1.2 (2026) of the Syrian Communications Code in Building out for public consultation, SANA reported on 19 August 2026. The agency describes it as the first regulation in Syria to make communications a condition for a building permit.

What the telecom building code covers

According to SANA and Daily Post Arabic, the draft sets out the telecom infrastructure a building must have, including:

  • entry points where cables come into the building;
  • a main telecom room and floor telecom rooms;
  • vertical and horizontal cable routes;
  • outlets inside each residential or commercial unit.

Fiber is the basis for new buildings under the draft, which also requires readiness for 5G and indoor coverage. Compliance is tied to licensing, handover and occupancy certificates.

Comments were accepted until 31 August 2026, and the code does not become binding until it is formally issued. Malik Haj Ali, head of the Engineers Syndicate, called for phased implementation and for existing buildings to be treated case by case.

What it means for infrastructure

If adopted, the code would stop telecom cabling being treated as an afterthought and build it into the design from day one. That means steady demand for FTTH design inside buildings, and for in-building cabling that is installed, tested and documented to match the drawings. Our services cover this kind of work.

Sources: SANA (19 August 2026), Daily Post Arabic (page undated)